Sportrack Synthetic Surfaces

Eco-Ride Plus

Eco-Ride Plus pre-mixed riding surface is the ideal surface  for providing additional cushioning by the increase inclusion of synthetic fibres.
Eco-Ride Plus is a blend of equestrian grade silica sands, mixed with synthetic fibres and a small percentage of rubber crumb.
Eco-Ride Plus is a non-waxed riding surface which may require irrigation, particularly in dry periods, to maintain its condition and ensure maximum performance. Eco-Ride is designed to meet the needs of each discipline, from show jumping and dressage, to eventing, jumping, and lunging.

Eco-Ride Plus Benefits

  • Pre-mixed at our UK site for a quick and easy installation to your location
  • Suitable to meet the needs of all disciplines
  • Excellent value for money
  • Ideal for instalment for those with damp/wet climates
  • Increased structure and stability for you and your horse
  • The ideal jump surface with the higher fibre content

Call the sales team on 01709 845 895 or email info@sportracksurfaces.co.uk for more information and availability. 
See our other waxed surfaces

Equi-Ride Waxed
Eco-Ride Waxed

‘After a 10 year period from installation of our sand and fibre surface we were in need of a replacement and in doing so we placed major importance on the surface being suitable for producing and working show jumping and dressage competition horses.

Our number one priority was the welfare and soundness of the horses, bearing in mind they would be ridden 6 days a week on the surface we were choosing.

After discussions with several suppliers and much research we decided to give the contract to Sportrack Surfaces who visited our yard, carried out a detailed survey, answered all our questions and then made their recommendation which was for their Eco-Ride Plus Premixed Surface with specially formulated fibres to suit our specific needs.

We fine-tuned and finalised the specification and tonnage (with much patience shown by both Sam and Olivia during this time) and then agreed a commencement date and just after a couple of weeks the equipment and man power arrived as scheduled and the work commenced.
Nothing was too much trouble for Sam and the team and within 3 days the work was completed with everything going like clockwork as planned.

Our property was left clean and tidy and just how it was prior to commencement but with a new surface that rides so much better than the previous surface.
I can only thank Sam and Olivia and the Sportrack team for a great job!

Many Thanks
Colin’

Gallery

Get in touch